This is historical material, "frozen in time." The web site is no longer updated and links to external web sites and some internal pages will not work.

DOT NEWS RELEASE: OAHU LANE CLOSURES FOR THE WEEK OF MAY 29 – JUNE 4

Posted on May 28, 2021 in Latest Department News, Newsroom

PLEASE NOTE:

Lane closure schedules may change at any time without further notice.  All projects are weather permitting.

 

No daytime roadwork will be scheduled on Monday, May 31, in observance of Memorial Day Holiday. Special use lanes and HOV lanes will not be operational.

 

— H-1 FREEWAY —

 

1) HONOLULU

Right or left lane closure on the Pali Highway offramp (Exit 21A) from the H-1 Freeway in the eastbound direction on Tuesday, June 1, through Friday, June 4, from 9 a.m. to 3 p.m., for electrical work.

 

2) HONOLULU

Right lane closure on the H-1 Freeway in the eastbound direction between the Kalihi Street overpass and the Liliha Street overpass on Tuesday, June 1, through Friday, June 4, from 8:30 a.m. to 2:30 p.m., for guardrail repairs.

 

3) HONOLULU

Right lane closure on the H-1 Freeway in the eastbound direction between the Punahou Street overpass and the Ward Avenue overpass on Tuesday, June 1, through Friday, June 4, from 8:30 a.m. to 2:30 p.m., for guardrail repairs.

 

4) HONOLULU (WEEKEND WORK)

Right lane closure on the H-1 Freeway in the westbound direction between the on Saturday, May 22, from 7 a.m. to 12 p.m., for pothole patching.

 

5) HONOLULU (NIGHT WORK)

Full closure of the Airport offramp (Exit 16) from the H-1 Freeway in the eastbound direction on Tuesday, June 1, through Friday, June 4, from 7 p.m. to 5 a.m., for The Rail project.

 

See HART website (https://www.honolulutransit.org/inform/traffic) for additional information or call the rail hotline (808) 566-2299.

 

6) HONOLULU (NIGHT WORK)

Lanes shifted on the Middle Street/Dillingham offramp (Exit 18B) from the H-1 Freeway in the eastbound direction on Tuesday, June 1, through Friday, June 4, from 8 p.m. to 4 a.m., for The Rail project.

 

See HART website (https://www.honolulutransit.org/inform/traffic) for additional information or call the rail hotline (808) 566-2299.

 

7) HONOLULU TO HALAWA

Roving lane closure on the H-1 Freeway in both directions between the Halawa Interchange and Keehi Interchange on Tuesday, June 1, through Friday, June 4, from 9 a.m. to 1:30 p.m., for sign replacement work.

 

8) HONOLULU TO SALT LAKE (NIGHT WORK)

Alternating 2-3 lane closures on the H-1 Freeway in both directions between the Radford Drive overpass and Keehi Interchange on Tuesday, June 1, through Friday, June 4, from 9 p.m. to 4 a.m., for bridge inspections.

 

 

— H-2 FREEWAY —

 

1) WAHIAWA TO WAIPAHU (NIGHT WORK)

Lane shifts and possible closures of the onramps and offramps from the H-2 Freeway in both directions between Wilikina Drive and the H-1 Freeway on Tuesday, June 1, through Friday, June 4, from 5 p.m. to 4:30 a.m., for street marking. Ramps will remain open unless there is a safety concern, or the minimum lane width cannot be maintained. If a ramp closure is needed, signage and a detour will be in place.

 

For more information https://hidot.hawaii.gov/blog/2021/05/05/roadwork-scheduled-on-the-h-2-freeway-onramps-and-offramps-on-may-10-may-19-for-marking-installations/

 

 

— H-201 MOANALUA FREEWAY —

 

1) MOANALUA

Right lane closure on the H-201 Moanalua Freeway in the westbound direction between Middle Street and the Ahua Road overpass on Tuesday, June 1, through Friday, June 4, from 8:30 a.m. to 2:30 p.m., for guardrail repairs.

 

 

— H-3 FREEWAY —

 

1) HALAWA TO KANEOHE

Roving closure on the H-3 Freeway in both directions between the Halawa Interchange and Kamehameha Highway on Tuesday, June 1, and Wednesday, June 2, from 9 a.m. to 11 a.m., for street sweeping.

 

 

— FARRINGTON HIGHWAY (ROUTES 93/99/930) —

 

1) PEARL CITY

Lane closure on Farrington Highway (Route 99) in the eastbound direction between Kamehameha Highway and Waiawa Road on Tuesday, June 1, through Friday, June 4, from 8:30 a.m. to 3 p.m., for waterline work.

 

2) WAIALUA

Roving lane closure on Farrington Highway (Route 930) in both directions between Dillingham Airfield and Kaukonahua Road on Friday, June 4, from 8:30 a.m. to 3 p.m., for grass trimming and litter removal.

 

3) WAIANAE (24/7 CLOSURE + CONTRAFLOW)

The eastbound shoulder and right lane of Farrington Highway (Route 93) between Maipalaoa Road and St. John’s Road will remain closed over a 24-hour period, seven days a week for the Maipalaoa Bridge Replacement project.

Contraflow of the middle lane to support the morning and afternoon commutes operates Monday through Friday. For the morning commute there are two lanes going eastbound and one lane going westbound. For the afternoon commute the middle lane is switched over to provide two lanes westbound and one eastbound lane. On weekends and holidays the middle lane is set in the westbound direction.

 

4) WAIANAE

Right lane closure on Farrington Highway (Route 93) in the eastbound direction in the vicinity of Maipalaoa Road on Tuesday, June 1, through Friday, June 4, from 8:30 a.m. to 3 p.m., for demolition work.

 

5) WAIANAE

Right lane closure on Farrington Highway (Route 93) in the eastbound direction between Mailiilii Road and Maipalaoa Road on Thursday, June 3, from 8:30 a.m. to 12:30 p.m., for overhead utility work.

 

6) WAIPAHU (WEEKEND/NIGHT WORK)

Lanes will be closed as needed on Farrington Highway (Route 7101) in both directions between Fort Weaver Road and the H-1 Freeway Overpass (near Leeward Community College), on Sunday, May 30, through Friday, June 4, over a 24-hour period, for The Rail.

 

See HART website (https://www.honolulutransit.org/inform/traffic) for additional information or call the rail hotline (808) 566-2299.

 

 

— KALANIANAOLE HIGHWAY (ROUTES 61/72) —

 

1) AINA HAINA (NIGHT WORK)

Two center lane closures on Kalanianaole Highway (Route 72) in the eastbound direction between Waa Street and Kaimoku Street on Tuesday, June 1, through Friday, June 4, from 8 p.m. to 4 a.m., for trenching, pipe installations, and sidewalk repairs.

 

2) AINA HAINA (NIGHT WORK)

Right turn closure on Kalanianaole Highway (Route 72) in the eastbound direction in the vicinity of Puuikena Drive on Friday, May 28, from 10 a.m. to 10 p.m., for film work.

 

3) HAWAII KAI (WEEKEND WORK)

Shoulder closure on Kalanianaole Highway (Route 72) in the eastbound direction in the vicinity of Lanai Lookout on Sunday, May 30, from 9 a.m. to 10 a.m., for film work.

 

4) NIU VALLEY

Alternating lane closure on Kalanianaole Highway (Route 72) in both directions between Moomuku Place and Hawaii Loa Street on Tuesday, June 1, through Friday, June 4, from 8:30 a.m. to 2:30 p.m., for sewer repairs.

 

5) KAILUA

Roving lane closure on Kalanianaole Highway (Route 72) in both directions between Old Kalanianaole Road and Kailua Road on Tuesday, June 1, through Friday, June 4, from 9 a.m. to 1:30 p.m., for restriping.

 

6) KAILUA

Right lane closure on Kalanianaole Highway (Route 61) in the southbound direction between Pali Highway and Kapaa Quarry Road on Tuesday, June 1, through Friday, June 4, from 8:30 a.m. to 3 p.m., for tree trimming.

 

 

 

— KAMEHAMEHA HIGHWAY (ROUTES 80/83/99) —

 

1) HALEIWA TO PEARL CITY

Roving lane closure on Kamehameha Highway (Route 99) in both directions between Weed Circle and the H-1/H-2 Split on Tuesday, June 1, through Friday, June 4, from 8:30 a.m. to 3 p.m., for grass trimming and litter removal.

 

2) KAHALUU

Roving right lane closure on Kamehameha Highway (Route 83) in the northbound direction between Kahekili Highway and Johnson Road on Thursday, June 3, from 8:30 a.m. to 3 p.m., for tree trimming.

 

3) KALIHI (24/7 CLOSURE)

Kamehameha Highway between Middle Street and Laumaka Street will be reduced to one westbound and one eastbound lane 24-hours a day, seven days a week, for The Rail. Other adjustments to the area include:

  • No left turns from Kamehameha Highway will be allowed.
  • Pedestrian access will be maintained.
  • Driveway and Business access will be maintained.
  • The H-1 eastbound off-ramp to Dillingham Blvd. will be reduced to one lane. Middle Street southbound left turn reduced to single turn lane.
  • The sidewalk on the makai side of Dillingham Boulevard between Puuhale Road and Mokauea Street will be closed 24/7 with pedestrians rerouted to the mauka sidewalk.

See HART website (https://www.honolulutransit.org/inform/traffic) for additional information or call the rail hotline (808) 566-2299.

 

4) LAIE

Roving lane closure on Kamehameha Highway (Route 83) in both directions in the vicinity of Wahinepee Street on Tuesday, June 1, through Friday, June 4, from 8:30 a.m. to 12:30 p.m., for bridge repairs.

 

5) PEARL CITY

Right lane closure on Kamehameha Highway (Route 99) in the westbound direction between Acacia Road and Waihona Street on Tuesday, June 1, through Friday, June 4, from 8:30 a.m. to 3 p.m., for waterline work.

 

6) SALT LAKE (NIGHT WORK)

Full closure of Kamehameha Highway (Route 99) in both directions between Center Drive and Radford Drive on Tuesday, June 1, through Friday, June 4, from 8 p.m. to 5 a.m., for The Rail project. Motorists will be detoured.

 

See HART website (https://www.honolulutransit.org/inform/traffic) for additional information or call the rail hotline (808) 566-2299.

 

7) SALT LAKE (NIGHT WORK)

Full closure on Kamehameha Highway (Route 99) in the westbound direction between Salt Lake Boulevard and Halawa Drive on Wednesday, June 2, from 8 p.m. to 5 a.m., for The Rail project. Traffic will be detoured.

 

See HART website (https://www.honolulutransit.org/inform/traffic) for additional information or call the rail hotline (808) 566-2299.

 

8) SALT LAKE

Right lane closure on Kamehameha Highway (Route 99) in the westbound direction between Ford Island Boulevard and Salt Lake Boulevard on Tuesday, June 1, through Friday, June 4, from 7 am. to 3:30 p.m., for The Rail project.

 

See HART website (https://www.honolulutransit.org/inform/traffic) for additional information or call the rail hotline (808) 566-2299.

 

9) WAHIAWA

Right lane closure on Kamehameha Highway (Route 80) in the northbound direction between Avocado Street and California Avenue on Wednesday, June 2, from 8:30 a.m. to 12:30 p.m., for utility work.

 

10) WAHIAWA

Right lane closure on Kamehameha Highway (Route 99) in the northbound direction between Wilikina Drive and Paalaa Pupukea Road on Tuesday, June 1, through Friday, June 4, from 8:30 am. to 3 p.m., for utility work.

 

 

— LIKELIKE HIGHWAY (ROUTE 63) —

 

1) KANEOHE

Right lane closure on Likelike Highway (Route 63) in the eastbound direction in the vicinity of Kahekili Highway on Tuesday, June 1, from 8:30 a.m. to 2:30 p.m., for utility work.

 

 

— NIMITZ HIGHWAY (ROUTE 92) —

 

1) HONOLULU (NIGHT WORK)

Right lane closure of Nimitz Highway (Route 92) in the westbound direction between Halekauwila Street and Sumner Street on Tuesday, June 1, through Friday, June 4, over a 24-hour period, for The Rail work.

 

See HART website (https://www.honolulutransit.org/inform/traffic) for additional information or call the rail hotline (808) 566-2299.

 

2) HONOLULU (WEEKEND/NIGHT WORK)

Lane closure of Nimitz Highway (Route 92) in both directions between Lagoon Drive and Sand Island Access Road on Sunday, May 31, through Friday, June 4, over a 24-hour period, for The Rail work. Motorists will be detoured.

 

See HART website (https://www.honolulutransit.org/inform/traffic) for additional information or call the rail hotline (808) 566-2299.

 

 

— PALI HIGHWAY (ROUTE 61) —

 

1) HONOLULU

Two lane closures on the Pali Highway in both directions between the H-1 Freeway and Vineyard Boulevard on Tuesday, June 1, through Friday, June 4, from 9 a.m. to 3 p.m., for electrical work.

 

For more information, please visit the Pali Highway Resurfacing project website at https://palihighway.org

 

2) HONOLULU

Left lane closure and left turn pocket closed on the Pali Highway in the southbound direction between the H-1 Freeway and Vineyard Boulevard on Tuesday, June 1, through Friday, June 4, from 9 a.m. to 3 p.m., for electrical work.

 

For more information, please visit the Pali Highway Resurfacing project website at https://palihighway.org

 

3) HONOLULU

Lane closure on the Pali Highway in both directions between Wylie Street and Coelho Way on Tuesday, June 1, through Friday, June 4, from 9 a.m. to 4 p.m., for electrical work.

 

For more information, please visit the Pali Highway Resurfacing project website at https://palihighway.org

 

4) NUUANU

Right lane closure on the Pali Highway in the northbound direction between Niolopa Street and Nuuanu Pali Drive on Tuesday, June 1, through Friday, June 4, from 7 a.m. to 3 p.m., for sidewalk, curb and gutter work.

 

5) NUUANU

Roving lane closure on the Pali Highway in both directions between Akamu Place an Waokanaka Street on Friday, June 4, from 9 a.m. to 1:30 p.m., for maintenance of sidewalk gateways.

 

6) NUUANU

Lane closure on the Pali Highway in the southbound direction between Pali Tunnels and Nuuanu Pali Drive on Tuesday, June 1, through Friday, June 4, from 9 a.m. to 5 p.m., for striping work.

 

7) NUUANU

Lane closure on the Pali Highway in the southbound direction between Pali Tunnels and Kamehameha Highway on Tuesday, June 1, through Friday, June 4, from 7 a.m. to 3 p.m., for striping work.

 

8) NUUANU

Right lane closure on the Pali Highway in the southbound direction between Wylie Street and Dowsett Avenue on Tuesday, June 1, through Friday, June 4, from 9 a.m. to 6 p.m., for curb, gutter and sidewalk work.

 

 

—ALA MOANA BOULEVARD —

 

1) KAIMUKI (WEEKEND WORK)

Right lane closure on Ala Moana Boulevard in the westbound direction between Piikoi Street and Atkinson Drive on Saturday, May 29, from 8:30 a.m. to 2 p.m., for tree trimming.

 

 

—VINEYARD BOULEVARD —

 

1) HONOLULU

Left lane closure on Vineyard Boulevard in the eastbound direction between Maunakea Street and Queen Emma Street on Tuesday, June 1, through Friday, June 4, from 9 a.m. to 3 p.m., for resurfacing work.

 

2) HONOLULU

Left lane closures on Vineyard Boulevard in the westbound direction between Queen Emma Street and Nuuanu Avenue on Tuesday, June 1, through Friday, June 4, from 9 a.m. to 3 p.m., for resurfacing work.

 

3) HONOLULU

Left turn pocket closure from Vineyard Boulevard in both directions onto Maunakea Street on Tuesday, June 1, through Friday, June 4, from 9 a.m. to 3 p.m., for resurfacing work.

 

4) HONOLULU

Left lane closure on Vineyard Boulevard in both directions between River Street and Nuuanu Avenue on Tuesday, June 1, through Friday, June 4, from 8:30 a.m. to 12:30 p.m., for resurfacing work.

 

 

— KAPOLEI PARKWAY —

 

1) EWA

Right lane closure on Kapolei Parkway in the westbound direction between Kolowaka Drive and Renton Road on Tuesday, June 1, through Friday, June 4, from 8:30 a.m. to 3 p.m., for the Leeward Bikeways project.

 

— KUALAKAI PARKWAY —

 

1) EWA

Kualakai Parkway between Farrington Highway and Keahumoa Parkway is City Maintained State Highway.

Lane closure on Kualakai Parkway in both directions between Keahumoa Parkway and Farrington Highway on Tuesday, June 1, through Friday, June 4, from 7 a.m. to 3:30 p.m., for the rail.

See HART website (https://www.honolulutransit.org/inform/traffic) for additional information or call the rail hotline (808) 566-2299

 

 

— ALIINUI DRIVE —

 

1) KAPOLEI

Right lane closure on the Aliinui Drive onramp to Farrington Highway in the westbound direction on Tuesday, June 1, from 8:30 a.m. to 12:30 p.m., for utility work.

 

 

— LAGOON DRIVE —

 

1) HONOLULU

Lane closure on Lagoon Drive in both directions between Aolele Street and Waiwai Loop on Tuesday, June 1, through Friday, June 4, from 7 a.m. to 5 p.m., for The Rail work.

 

See HART website (https://www.honolulutransit.org/inform/traffic) for additional information or call the rail hotline (808) 566-2299.

 

 

— NUUANU AVENUE —

 

1) NUUANU

Lane closure on Nuuanu Avenue in both directions in the vicinity of Wylie Street on Tuesday, June 1, through Friday, June 4, from 9 a.m. to 4 p.m., for electrical work.

 

 

— WAIALAE AVENUE —

 

1) KAHALA

Right lane closure on Waialae Avenue in both directions in the vicinity of Kilauea Avenue on Tuesday, June 1, through Friday, June 4, from 9 a.m. to 3 p.m., for manhole inspections.

 

— ALA AUANA STREET —

 

1) HONOLULU (NIGHT WORK)

Intermittent stoppages on Ala Auana Street on Tuesday, June 1, through Friday morning, June 4, from 7 a.m. to 5 p.m., and 9 p.m. to 4 a.m., for The Rail project.

 

See HART website (https://www.honolulutransit.org/inform/traffic) for additional information or call the rail hotline (808) 566-2299

 

— AOLELE STREET —

 

1) HONOLULU (NIGHT WORK)

Full closure of Aolele Street in the eastbound direction in the vicinity of the Airport toll booths on Tuesday, June 1, through Friday morning, June 4, from 7 p.m. to 5 a.m., for The Rail project. Motorists will be detoured to Rodgers Street.

 

See HART website (https://www.honolulutransit.org/inform/traffic) for additional information or call the rail hotline (808) 566-2299

 

2) HONOLULU (NIGHT WORK)

Intermittent lane closure on Aolele Street in the westbound direction between Aolewa Street and the H-1 Freeway onramp on Tuesday, June 1, through Friday, June 4, from 9 p.m. to 4 a.m., for The Rail project.

 

See HART website (https://www.honolulutransit.org/inform/traffic) for additional information or call the rail hotline (808) 566-2299

 

3) HONOLULU (NIGHT WORK)

Intermittent lane closure on Aolele Street in the westbound direction between Aolewa Street and Lagoon Drive on Tuesday, June 1, through Friday, June 4, from 9 p.m. to 4 a.m., for The Rail project.

 

See HART website (https://www.honolulutransit.org/inform/traffic) for additional information or call the rail hotline (808) 566-2299

 

 

— MIDDLE STREET —

 

1) HONOLULU (NIGHT WORK)

Two lane closures on Middle Street in the northbound direction between Kamehameha Highway and King Street on Tuesday, June 1, through Friday, June 4, from 7 p.m. to 4 a.m., for pavement construction. Traffic will be contraflowed in the southbound lanes.

 

 

— OLOMEA STREET —

 

1) KALIHI (WEEKEND/NIGHT WORK)

Left lane closure on Olomea Street in the westbound direction between Kokea Street and Auld Lane on Sunday night, May 30, through Friday morning, June 4, over a 24-hour period, for sewer line work. The left turn lane onto Houghtailing Street will be closed.

 

— SCHOOL STREET —

 

1) HONOLULU

Lane closure on School Street in both directions between Nuuanu Avenue and Lusitania Street on Tuesday, June 1, through Friday, June 4, from 9 a.m. to 3 p.m., for electrical work.

 

— UALENA STREET —

 

1) HONOLULU (NIGHT WORK)

Full closure of Ualena Street nightly Tuesday, June 1, through Friday, June 4, from 8 p.m. to 4 a.m., for The Rail. Motorists and pedestrians will be detoured and on street parking will not be allowed.

 

One-way traffic in the westbound direction will take place daily, from 4 a.m. to 8 p.m.

 

See HART website (https://www.honolulutransit.org/inform/traffic) for additional information or call the rail hotline (808) 566-2299

 

 

— WYLIE STREET —

 

1) NUUANU

Right or left lane closure of Wylie Street in both directions between Nuuanu Avenue and Pali Highway on Tuesday, June 1, through Friday, June 4, from 9 a.m. to 4 p.m., for resurfacing work.

 

 

— FORT WEAVER ROAD (ROUTE 76) —

 

1) EWA (NIGHT WORK)

Lanes shifted on Fort Weaver Road in both directions between Renton Road and the H-1 Freeway on Tuesday, June 1, through Friday, June 4, from 7 p.m. to 5 a.m., for striping work.

###