This is historical material, "frozen in time." The web site is no longer updated and links to external web sites and some internal pages will not work.

HDOT News Release: Weekly lane closures

Posted on Feb 1, 2019 in Latest Department News

OAHU LANE CLOSURES

FOR THE WEEK OF FEB. 2 – FEB. 8

 

PLEASE NOTE:

Lane closure schedules may change at any time without further notice.
All projects are weather permitting.

 

— H-1 FREEWAY —

 

1) HONOLULU (24-HOUR WORK)

24-hour shoulder closure on the H-1 Freeway in the westbound direction between the Pali Highway overpass and the Houghtailing Street underpass on Friday, Feb. 1, through Friday, Feb. 8, for guardrail and shoulder improvements.

 

2) HONOLULU (24-HOUR WORK)

24-hour shoulder closure on the H-1 Freeway in the eastbound direction between the Kalihi Street overpass and the Liliha Street overpass on Friday, Feb.1, through Friday, Feb. 8, for guardrail and shoulder improvements.

 

3) HONOLULU (NIGHT WORK)
Two right lanes closed on the H-1 Freeway in both directions on Monday night, Feb. 4, through Friday morning, Feb. 8, from 9 p.m. to 4 a.m., for guardrail and shoulder improvements.

 

  • Eastbound closures between the Palama Street underpass and the Liliha Street overpass.
  • Westbound closures between the Punchbowl Street onramp and the Liliha Street overpass.

 

4) HONOLULU (NIGHT WORK)

Closure of the School Street onramp to the H-1 Freeway in the westbound direction on Monday night, Feb. 4, through Friday morning, Feb. 8, from 9 p.m. to 4 a.m., for guardrail and shoulder improvements. Motorists will be detoured via Palama Street and Vineyard Boulevard.

 

5) HONOLULU (NIGHT WORK)
Two lane closures on the H-1 Freeway in the westbound direction in the vicinity of the Airport offramp (Exit 16) on Monday, Feb. 4, through Friday, Feb. 8, from 10 p.m. to 4 a.m., for sign work.

 

6) HONOLULU

Roving right lane closure on the H-1 Freeway in both directions between the Kilauea Avenue underpass and the Middle Street overpass on Monday, Feb. 4, through Friday, Feb. 8, from 8:30 a.m. to 3 p.m., for lighting replacement.

 

7) KAPOLEI (NIGHT WORK)

Closure of the H-1 Freeway on Monday night, Feb. 4, through Friday morning, Feb. 8, for the Kapolei Interchange Complex, Phase 2 project. Motorists will be detoured.

 

  • Monday night through Wednesday morning – Closure in the westbound direction between the Makakilo Drive overpass and the Campbell Industrial Park/Barbers Point Harbor offramp (Exit 1) from 10 p.m. to 5 a.m. Motorists will be detoured via Makakilo Drive, Farrington Highway/Kamokila Boulevard, Wakea Street, and the Farrington Highway onramp to return to the westbound H-1 Freeway.
  • Wednesday night through Friday morning – Closure in the eastbound direction between the Campbell Industrial Park/Barbers Point Harbor offramp (Exit 1A) and Wakea Street onramp from 9 p.m. to 4:30 a.m. Motorists will be detoured via Kalaeloa Boulevard, Kapolei Parkway, Kamokila Boulevard, and the Wakea Street onramp.

 

For more information, visit the Kapolei Interchange Complex Phase 2 project website at https://www.buildkapolei.com/

 

8) PEARL CITY

Two lane closures on the H-1 Freeway in the eastbound direction between the Lehua Avenue underpass and the Pearlridge/Waimalu offramp (Exit 10) on Monday night, Feb. 4, through Wednesday morning, Feb. 6, from 9 p.m. to 4 a.m., for sign work.

 

9) WAIMALU TO AIEA (WEEKEND/WEEKLY/NIGHT WORK)

Shoulder closure on the H-1 Freeway in the eastbound direction between the Pearlridge/Waimalu offramp (Exit 10) and the Aiea Heights Drive overpass for shoulder widening work.

 

  • Saturday, Feb. 2, from 7 a.m. to 7 p.m.
  • Monday, Feb. 4, through Friday, Feb. 8, from 9 a.m. to 7 p.m., daily.

 

For more information, please visit the project website at https://h1waimalu.com/

 

 

— H-2 FREEWAY —

 

1) MILILANI
Right lane and shoulder closure on the H-2 Freeway in the northbound direction between Ka Uka Boulevard overpass and Pineapple Road overpass on Monday, Feb. 4, through Friday, Feb. 8, from 8:30 a.m. to 3 p.m., for guardrail improvements.

 

2) WAHIAWA
Right lane and shoulder closure on the H-2 Freeway in the southbound direction between Wilikina Drive and the Wahiawa offramp (Exit 8) on Monday, Feb. 4, through Friday, Feb. 8, from 8:30 a.m. to 3 p.m., for guardrail and shoulder improvements.

 

3) WAHIAWA
Right lane and shoulder closure on the H-2 Freeway in the northbound direction between the Leilehua Golf Course Road overpass and Wilikina Drive on Monday, Feb. 4, through Friday, Feb. 8, from 8:30 a.m. to 3 p.m., for guardrail and shoulder improvements.

 

4) WAIPAHU
Right lane closure on the H-2 Freeway in the Honolulu-bound direction in the vicinity of the H-1 Freeway on Monday, Feb. 4, through Friday, Feb. 8, from 8:30 a.m. to 3 p.m., for guardrail installations.

 

5) WAIPIO TO WAHIAWA
Lane shift and shoulder closure on the H-2 Freeway in the southbound direction in the vicinity of the Waianae offramp (Exit 1B) on Monday, Feb. 4, through Friday, Feb. 8, from 8:30 a.m. to 3 p.m., for guardrail and shoulder improvements.

 

 

— H-201 MOANALUA FREEWAY —

 

1) HALAWA (NIGHT WORK)

Lane closure on the H-201 Moanalua Freeway in the westbound direction between the Ola Lane overpass and the Middle Street overpass on Monday night, Feb. 4, through Friday morning, Feb. 8, from 10 p.m. to 4 a.m., for sign work.

 

H-3 FREEWAY

1) KANEOHE

Right lane closure on the H-3 Freeway in both directions at the Harano Tunnels on Tuesday, Feb. 5, from 8:30 a.m. to 11:30 a.m., for maintenance work.

 

 

— FARRINGTON HIGHWAY (ROUTES 93/930) —

 

1) WAIPAHU (NIGHT WORK)

Lane closure on Farrington Highway in both directions between Hakimo Road and Helelua Street on Monday night, Feb. 4, through Friday morning, Feb. 8, from 9 p.m. to 4 a.m., for electrical maintenance work. Traffic will be contraflowed in the opposite direction.

 

 

— KALANIANAOLE HIGHWAY (ROUTES 61/72) —

 

1) HAWAII KAI (NIGHT WORK)

Lane closure on Kalanianaole Highway in the eastbound direction between Lunalilo Home Road and Ainakoa Avenue on Monday night, Feb. 4, through Friday morning, Feb. 8, from 8 p.m. to 3:30 a.m., for striping work.

 

2) HAWAII KAI

Roving right lane closure on Kalanianaole Highway in both directions between Hanauma Bay Road and Makapuu Lighthouse Road on Monday, Feb. 4, through Friday, Feb. 8, from 7 a.m. to 2:30 p.m., for maintenance work.

 

3) WAIMANALO

Lane shift and shoulder closure on Kalanianaole Highway (Route 72) in both directions between Kanapuu Drive and Poalima Street on Monday, Feb. 4, through Friday, Feb. 8, from 8:30 a.m. to 3 p.m., for roadway reconstruction and utility work.

 

For more information, please visit the Kalanianaole Highway Improvements project website at https://www.gloverltd.com/projects/kalanianaole_highway/.

 

 

— KAMEHAMEHA HIGHWAY (ROUTES 80/83/99) —

 

1) AIEA

Right lane closure on Kamehameha Highway in the eastbound direction between McGrew Loop and the H-201 Moanalua Freeway onramp on Monday, Feb. 4, and Tuesday, Feb. 5, from 8:30 a.m. to 12:30 p.m., for electrical maintenance work.

 

2) HALAWA

Lane closure on Kamehameha Highway in the Honolulu-bound direction between Honomanu Street and Salt Lake Boulevard on Monday, Feb. 4, through Friday, Feb. 8, from 8:30 a.m. to 3 p.m., for slope improvement work.

 

3) HALEIWA TO KAHALUU
Roving lane closure on Kamehameha Highway (Route 83) in both directions between Joseph P. Leong Highway and Kahekili Highway on Monday, Feb. 4, through Friday, Feb. 8, from 8 a.m. to 2 p.m., for maintenance work. Traffic will be contraflowed.

 

4) KANEOHE (WEEKEND/NIGHT WORK)

Alternating lane closure on Kamehameha Highway (Route 83) in both directions between Kahiko Street and Halekou Road on Friday night, Feb. 1, through Saturday morning, Feb. 2, from 9 p.m. to 4 a.m., for maintenance work.

 

5) PEARL CITY (24-HOUR WORK)

Lane closure on Kamehameha Highway (Route 99) in the eastbound direction between Waihona Street and Acacia Road beginning Tuesday, Feb. 5, over a 24-hour period, for The Rail project.

 

Please visit The Rail’s project website for more details at https://www.honolulutransit.org/.

 

 

— LIKELIKE HIGHWAY (ROUTE 63) —

 

1) KALIHI

One to two lanes closed on Likelike Highway (Route 63) in the Honolulu-bound direction between Emmeline Place and School Street on Monday, Feb. 4, through Friday, Feb. 8, from 9 a.m. to 3:30 p.m., for grass cutting and maintenance work.

 

2) KALIHI

Lane closure on Likelike Highway (Route 63) in the Kaneohe-bound direction between Gulick Avenue and Emmeline Place on Monday, Feb. 4, through Friday, Feb. 8, from 8:30 a.m. to 3 p.m., for grass cutting and maintenance work.

 

3) NUUANU

Right shoulder closure on Likelike Highway in the Honolulu-bound direction in the vicinity of the Wilson Tunnel on Monday, Feb. 4, through Friday, Feb. 8, from 9 a.m. to 2 p.m., for maintenance work.

 

 

— NIMITZ HIGHWAY (ROUTE 92) —

 

1) HONOLULU (WEEKEND WORK)

Left lane closure on Nimitz Highway (Route 92) in both directions in the vicinity of Ahua Street on Saturday, Feb. 2, from 6 a.m. to 12 p.m., for electrical maintenance work.

 

2) HONOLULU (WEEKEND WORK)

Lane closure on Nimitz Highway (Route 92) in the eastbound direction at the Keehi Interchange on Saturday, Feb. 2, from 5:30 a.m. to 11 a.m., for bridge deck repairs.

 

3) HONOLULU (WEEKEND/NIGHT WORK)

Two left lane closures on Nimitz Highway (Route 92) in the westbound direction in the vicinity of Bishop Street on Thursday, Feb. 7, from 8:30 a.m. to 12:30 p.m., for maintenance work.

 

4) HONOLULU

Alternating lane closures on Nimitz Highway in both directions between Aala Street and Nuuanu Avenue on Monday, Feb. 4, through Friday, Feb. 8, from 8:30 a.m. to 2 p.m., for maintenance work.

 

 

— PALI HIGHWAY (ROUTE 61) —

 

1) KANEOHE TO NUUANU (NIGHT WORK)

Closure of the Pali Highway (Route 61) in the Honolulu-bound direction between Kamehameha Highway and Waokanaka Street on Monday night, Feb. 4, through Friday morning, Feb. 8, from 8:30 p.m. to 5 a.m., for the Pali Highway Resurfacing project.

 

For more information, please visit the Pali Highway Resurfacing project website at https://palihighway.org

             

2) MAUNAWILI (NIGHT WORK)

Left lane closure on the Pali Highway (Route 61) in the Kailua-bound direction between the Pali Tunnels and Kamehameha Highway on Monday night, Feb. 4, through Friday morning, Feb. 8, from 8:30 p.m. to 5 a.m., for the Pali Highway Resurfacing project.

 

For more information, please visit the Pali Highway Resurfacing project website at https://palihighway.org

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                3) NUUANU (NIGHT WORK)

Up to two lanes tentatively closed on the Pali Highway (Route 61) in the Honolulu-bound direction between Waokanaka Street and Nuuanu Avenue on Monday night, Feb. 4, through Friday morning, Feb. 8, from 7 p.m. to 5 a.m., for the Pali Highway Resurfacing project.

 

For more information, please visit the Pali Highway Resurfacing project website at https://palihighway.org

 

4) NUUANU (NIGHT WORK)

Up to two lanes tentatively closed on the Pali Highway (Route 61) in the Kailua-bound direction between Nuuanu Avenue and Waokanaka Street on Monday night, Feb. 4, through Friday morning, Feb. 8, for the Pali Highway Resurfacing project.

 

  • One lane closed from 6:45 p.m. to 9 p.m.
  • Two lanes closed from 9 p.m. to 5 a.m.

 

For more information, please visit the Pali Highway Resurfacing project website at https://palihighway.org

 

5) NUUANU (NIGHT WORK)

Left lane closure on the Pali Highway (Route 61) in the Kailua-bound direction between Nuuanu Pali Drive and the Pali Tunnels on Monday night, Feb. 4, through Friday morning, Feb. 8, from 8:30 p.m. to 5 a.m., for the Pali Highway Resurfacing project.

 

For more information, please visit the Pali Highway Resurfacing project website at https://palihighway.org

 

6) NUUANU (NIGHT WORK)

Up to two lanes closed on the Pali Highway (Route 61) in the Kailua-bound direction between Waokanaka Street and Nuuanu Pali Drive on Monday night, Feb. 4, through Friday morning, Feb. 8, from 8:30 p.m. to 5 a.m., for the Pali Highway Resurfacing project.

 

For more information, please visit the Pali Highway Resurfacing project website at https://palihighway.org

 

7) NUUANU (NIGHT WORK)

Left turn pocket closed at Waokanaka Street on the Pali Highway (Route 61) in the Kailua-bound direction on Monday night, Feb. 4, through Friday morning, Feb. 8, from 8:30 p.m. to 5 a.m., for the Pali Highway Resurfacing project.

 

For more information, please visit the Pali Highway Resurfacing project website at https://palihighway.org

 

8) NUUANU

Lane closures on the Pali Highway (Route 61) in the Honolulu-bound direction on Monday, Feb. 4, through Friday, Feb. 8, for the Pali Highway Resurfacing project.

 

  • Left lane will be closed from the Pali Tunnels to Waokanaka Street from 9 a.m. to 5:30 p.m.
  • Right lane will be closed from Waokanaka Street to Dowsett Avenue from 9 a.m. to 7 p.m.
  • Lane will be closed at the Funchal Street intersection from 9 a.m. to 3 p.m. Access to Honolulu-bound Pali Highway will be limited to school traffic only. Traffic will be detoured via South Kuakini Street.
  • Right lane will be closed from Pauoa Road to South Kuakini Street from 9 a.m. to 3 p.m.
  • Right lane will be closed from the eastbound H-1 Freeway offramp to Vineyard Boulevard from 9 a.m. to 3 p.m.

 

For more information, please visit the Pali Highway Resurfacing project website at https://palihighway.org

 

9) NUUANU

Lane closures on the Pali Highway (Route 61) in the Kailua-bound direction on Monday, Feb. 4, through Friday, Feb. 8, for the Pali Highway Resurfacing project.

 

  • Right lane will be closed from Vineyard Boulevard to Pauoa Road from 7 a.m. to 3 p.m.
  • Lane will be closed from Pauoa Road to Waokanaka Street from 7 a.m. to 3 p.m.
  • Left lane will be closed intermittently from Waokanaka Street to the Pali Tunnels from 7 a.m. to 3 p.m.

 

For more information, please visit the Pali Highway Resurfacing project website at https://palihighway.org

 

 

— ALA MOANA BOULEVARD —

 

1) HONOLULU

Right lane closure on Ala Moana Boulevard in the westbound direction in the vicinity of Atkinson Drive on Thursday, Feb. 7, from 8:30 a.m. to 12:30 p.m., for maintenance work.

 

 

— VINEYARD BOULEVARD —

 

1) HONOLULU

Two lane closures on Vineyard Boulevard in both directions between Aala Street and Maunakea Street on Monday, Feb. 4, through Friday, Feb. 8, from 8:30 a.m. to 3 p.m., for traffic signal work.

 

 

— KEAHUMOA PARKWAY —

 

1) KAPOLEI (24-HOUR WORK)

Lane shifts on Keahumoa Parkway in the westbound direction in the vicinity of Kualakai Parkway on Friday, Feb. 1, through Friday, Feb. 8, over a twenty-four hour period, for The Rail project.

 

For more information, please visit the project website for The Rail at https://www.honolulutransit.org/.

 

 

— KAILUA ROAD —

 

1) KAILUA

Alternating lane closure on Kailua Road in both directions at the Uluoa Street intersection on Friday, Feb. 8, from 9 p.m. to 4 a.m., for crosswalk maintenance.

 

 

— KUNIA ROAD (ROUTE 750) —

 

1) KUNIA TO WAHIAWA (WEEKEND WORK)
Roving lane closure on Kunia Road (Route 750) in both directions between the H-1 Freeway and Wilikina Drive on Saturday, Feb. 2, from 8 a.m. to 2 p.m., for maintenance work.

 

 

— MOKAPU SADDLE ROAD (ROUTE 630) —

 

1) KAILUA

Alternating lane closure on Mokapu Saddle Road (Route 630) in both directions between Nanamoana Street and Oneawa Street on Monday, Feb. 4, through Friday, Feb. 8, from 8:30 a.m. to 3 p.m., for electrical, guardrail, and striping work.

 

 

—PUULOA ROAD —

 

1) MOANALUA

Roving right lane and shoulder closure on Puuloa Road/Jarrett White Road in both directions between Nimitz Highway and Ward Road on Monday, Feb. 4, through Friday, Feb. 8, from 9:30 a.m. to 2 p.m., for maintenance work.

 

 

— KALIHI STREET (ROUTE 63) —

 

1) KALIHI (WEEKEND/NIGHT WORK)

Lane closures on Kalihi Street (Route 63) in both directions between Dillingham Boulevard and Nimitz Highway on Sunday night, Feb. 3, through Friday morning, Feb. 8, from 7 p.m. to 4:30 a.m., for manhole maintenance and loop detector installations. One lane will remain open in each direction at all times.

 

 

— MIDDLE STREET —

 

1) KALIHI (WEEKEND/NIGHT WORK)

Alternating lane closure on Middle Street in both directions between North King Street and Kamehameha Highway on Friday night, Feb. 1, through Saturday morning, Feb. 2, and on Monday night, Feb. 4, through Friday morning, Feb. 8, from 7 p.m. to 4 a.m., for loop detector and pavement marking installations. Traffic will be contraflowed.

 

Pedestrians are directed to use the east sidewalk as the west shared use walk and bike path is closed on a 24/7 basis.

 

 

 

For Immediate Release: Feb. 1, 2019

19-0055

 

KAUAI LANE CLOSURES

FOR THE WEEK OF FEB. 2 – FEB. 8

 

PLEASE NOTE:

Lane closure schedules may change at any time without further notice.
All projects are weather permitting.

 

— KAUMUALII HIGHWAY (ROUTE 50) —

 

1) HANAPEPE

Alternating lane closure and lane shifts on Kaumualii Highway (Route 50) in both directions between Puolo Road and Hana Road on Monday, Feb. 4, through Friday, Feb. 8, from 9 a.m. to 3 p.m., for work at the Hanapepe River Bridge. Traffic will be contraflowed on Monday, Feb. 4, through Wednesday, Feb. 6. Traffic will be shifted to the temporary bridge on Friday, Feb. 8.

 

 

— KUHIO HIGHWAY (ROUTES 56/560) —

 

1) KILAUEA TO PRINCEVILLE
Lane shift on Kuhio Highway (Route 56) between mile markers 21 and 28 on Monday, Feb. 4, through Friday, Feb. 8, from 8:30 a.m. to 3 p.m., for highway safety improvements.

 

2) LIHUE TO HAENA

Alternating lane closures on Kuhio Highway (Route 56/560) in both directions from the beginning of the route in Lihue to the end of the route in Haena on Monday, Feb. 4, through Friday, Feb. 8, from 8:30 a.m. to 3 p.m., for vegetation control and roadside maintenance.

3) LIHUE (WEEKEND/NIGHT WORK)

Alternating lane closures on Kuhio Highway (Route 56) in both directions between North Leho Drive and Kapule Highway on Sunday night, Feb. 3, through Friday morning, Feb. 8, from 8 p.m. to 5 a.m., for road reconstruction and repaving.

 

4) WAIKOKO TO WAINIHA (EMERGENCY WORK, LOCAL ACCESS BY CONVOY)
Limited access for local traffic on Kuhio Highway (Route 560) between Waikoko and Wainiha on Mondays through Saturdays from 5:50 a.m. to 11 p.m. and Sundays and holidays from 6 a.m. to 11 p.m., due to slope stabilization work. To view the limited access schedule, please click here.

 

 

— AHUKINI ROAD (ROUTE 570) —

 

1) LIHUE

Alternating lane closure on Ahukini Road (Route 570) in both directions in the vicinity of the Kuhio Highway intersection on Monday, Feb. 4, through Friday, Feb. 8, from 8:30 a.m. to 3:30 p.m., for vegetation control and roadside maintenance.

 

 

— MAALO ROAD (ROUTE 583) —

 

1) LIHUE TO WAILUA

Alternating lane closures on Maalo Road (Route 583) in both directions from the beginning of the route at the intersection with Kuhio Highway to the end of the route at Wailua Falls on Monday, Feb. 4, through Friday, Feb. 8, from 8:30 a.m. to 3 p.m., for vegetation control and roadside maintenance.

 

 

— KAPAA BYPASS ROAD (ROUTE 5600) —

 

1) KAPAA

Alternating lane closures on the Temporary Kapaa Bypass Road (Route 5600) in both directions on Monday, Feb. 4, through Friday, Feb. 8, from 8:30 a.m. to 3 p.m., for vegetation control and roadside maintenance.

 

 

— KUAMOO ROAD (ROUTE 580) —

 

1) WAILUA

Alternating lane closures on Kuamoo Road (Route 580) in both directions from the beginning of the route at the intersection with Kuhio Highway to the end of the route on Monday, Feb. 4, through Friday, Feb. 8, from 8:30 a.m. to 3 p.m., for vegetation control and roadside maintenance.

 

 

— AHUKINI ROAD (ROUTE 570) —

 

1) LIHUE

Alternating lane closures on Ahukini Road (Route 570) in both directions from the beginning of the route at the intersection with Kuhio Highway to the end of the route at its intersection with Kapule Highway on Monday, Feb. 4, through Friday, Feb. 8, from 8:30 a.m. to 3 p.m., for vegetation control and roadside maintenance.

 

 

 

For Immediate Release: Feb. 1, 2019

19-0056

 

MAUI LANE CLOSURES

FOR THE WEEK OF FEB. 2 – FEB. 8

 

PLEASE NOTE:

Lane closure schedules may change at any time without further notice.
All projects are weather permitting.

 

— HANA HIGHWAY (ROUTE 36/360) —

 

1) KEANAE

Alternating lane closures on Hana Highway (Route 360) in both directions at mile markers 7 and 16 on Monday, Feb. 4, through Friday, Feb. 8, from 7 a.m. to 5 p.m., for steel reinforcement installations and slope excavation. Traffic will be contraflowed.

 

 

KUIHELANI HIGHWAY (ROUTE 380)

 

1) KAHULUI

Single lane closure on Kuihelani Highway (Route 380) in both directions at the Puunene Avenue intersection on Monday, Feb. 4, through Friday, Feb. 8, from 8 a.m. to 3 p.m., for surveying work.

 

 

PUUNENE AVENUE

 

1) KAHULUI

Single lane closure on Puunene Avenue in both directions at the Kuihelani Highway (Route 380) intersection on Monday, Feb. 4, through Friday, Feb. 8, from 8 a.m. to 3 p.m., for surveying work.

 

 

KAMAAINA ROAD

 

1) PUUNENE

Lane closure on Kamaaina Road in the eastbound direction at the Maui Veterans Highway (Route 311) intersection on Monday, Feb. 4, from 7 a.m. to 7:30 a.m., for electrical work.

 

 

 

For Immediate Release: Feb. 1, 2019

19-0057

 

HAWAII ISLAND LANE CLOSURES

FOR THE WEEK OF FEB. 2 – FEB. 8

                                                                                                                  

PLEASE NOTE:

Lane closure schedules may change at any time without further notice.
All projects are weather permitting.

 

— MAMALAHOA HIGHWAY (ROUTE 11/190) —

 

1) KAU

Alternating lane closure on Mamalahoa Highway (Route 11) in both directions between mile markers 54 and 57 in Pahala on Monday, Feb. 4, through Friday, Feb. 8, from 8 a.m. to 2 p.m., for landscaping and shoulder work.

 

2) NORTH KONA

Alternating lane closure on Mamalahoa Highway (Route 190) in both directions between Mile Markers 33 and 34 on Monday, Feb. 4, through Friday, Feb. 8, from 8 a.m. to 2 p.m., for landscaping and shoulder work.

 

3) SOUTH KONA

Alternating lane closure on Mamalahoa Highway (Route 11) in both directions between mile markers 93 and 95 on Monday, Feb. 4, through Friday Feb. 8, from 8 a.m. to 2 p.m., for landscaping and shoulder work.

 

 

— HAWAII BELT ROAD (ROUTE 11) —

 

1) KAU

Alternating lane closure on Hawaii Belt Road (Route 11) in both directions between mile markers 56 and 57 in the vicinity of Punaluu Black Sand Beach on Monday, Feb. 4, through Friday, Feb. 8, from 7:30 a.m. to 5:30 p.m., for road repairs.

 

2) MOUNTAIN VIEW

Alternating lane closure on Volcano Road (Route 11) in both directions in the vicinity of mile markers 13 and 16 on Monday, Feb. 4, through Friday, Feb. 8, from 8 a.m. to 2 p.m., for landscaping and shoulder work.

 

 

— HAWAII BELT ROAD (ROUTE 19) —

 

1) NORTH HILO (WEEKEND/WEEKLY WORK)

Alternating lane closure on Hawaii Belt Road (Route 19) in both directions in the vicinity of Mile Markers 6.5 and 10 on Saturday, Feb. 2, to Sunday, Feb. 3, from 6 a.m. to 6 p.m., and on Monday, Feb. 4, through Friday, Feb. 8, from 8 a.m. to 6 p.m., for road paving.

 

2) NORTH HILO (WEEKEND/WEEKLY WORK)

Alternating lane closure on Hawaii Belt Road (Route 19) in both directions in the vicinity of mile marker 19.4 in Ninole on Saturday, Feb. 2, and Monday, Feb. 4, through Friday, Feb. 8, from 8:30 a.m. to 5:30 p.m., for road repairs.

 

3) SOUTH HILO (WEEKEND/WEEKLY WORK)

Alternating lane closure on Hawaii Belt Road (Route 19) in both directions in the vicinity of mile marker 11.1 in Pepeekeo on Saturday, Feb. 2, and Monday, Feb. 4, through Friday, Feb. 8, from 7:30 a.m. to 5:30 p.m., for road repairs.

 

4) SOUTH HILO (WEEKEND/WEEKLY WORK)

Alternating lane closure on Hawaii Belt Road (Route 19) in both directions in the vicinity of mile marker 3.2 in Wainaku on Saturday, Feb. 2, and Monday, Feb. 4, through Friday, Feb. 8, from 8:30 a.m. to 5:30 p.m., for road repairs.

 

 

— AKONI PULE HIGHWAY (ROUTE 270) —

 

1) NORTH KOHALA

Alternating lane closure on Akoni Pule Highway (Route 270) in both directions in the vicinity of mile markers 21 and 23 in Kapaau on Monday, Feb. 4, through Friday, Feb. 8, from 8 a.m. to 2 p.m., for landscaping and shoulder work.

 

 

— KOHALA MOUNTAIN ROAD (ROUTE 250) —

 

1) SOUTH KOHALA

Alternating lane closure on Kohala Mountain Road (Route 250) in both directions between Mile Markers 5 and 6 in Kapaau on Monday, Feb. 1, through Friday, Feb. 8, from 8 a.m. to 2 p.m., for landscaping and shoulder work.

 

###

 

Patricia Wong

Information Specialist

Hawaii Department of Transportation

869 Punchbowl St. 96813

(808) 587-2160

[email protected]