This is historical material, "frozen in time." The web site is no longer updated and links to external web sites and some internal pages will not work.

HDOT News Release: Weekly lane closures

Posted on Mar 15, 2019 in Latest Department News

DEPARTMENT OF TRANSPORTATION

DAVID Y. IGE

GOVERNOR

 

JADE T. BUTAY

DIRECTOR

For Immediate Release: March 15, 2019

19-0133

 

OAHU LANE CLOSURES

FOR THE WEEK OF MARCH 16 – MARCH 22

 

PLEASE NOTE:

Lane closure schedules may change at any time without further notice.
All projects are weather permitting.

 

— H-1 FREEWAY —

 

1) HONOLULU (24-HOUR WORK)

24-hour shoulder closure on the H-1 Freeway in the westbound direction between the Pali Highway overpass and the Houghtailing Street underpass on Friday, March 15, through Friday, March 22, for guardrail and shoulder improvements.

 

2) HONOLULU (24-HOUR WORK)

24-hour shoulder closure on the H-1 Freeway in the eastbound direction in the vicinity of the Liliha Street overpass on Friday, March 15, through Friday, March 22, for guardrail and shoulder improvements.

 

3) HONOLULU (WEEKEND/NIGHT WORK)
Two right lanes closed on the H-1 Freeway in both directions on Sunday night, March 17, through Friday morning, March 22, from 9 p.m. to 4 a.m., for guardrail and shoulder improvements. The School Street onramp to the H-1 Freeway westbound will be closed during this time. Motorists will be detoured via Palama Street and Vineyard Boulevard.

 

  • Lane closures in the westbound direction are between Vineyard Boulevard offramp (Exit 22) and the Liliha Street overpass.
  • Lane closures in the eastbound direction are between the Palama Street overpass and the Liliha Street overpass.

 

4) HONOLULU (WEEKEND WORK)

Alternating lane closure on the Airport offramp (Exit 16) from the westbound H-1 Freeway on Saturday, March 16, from 5:30 a.m. to 11 a.m., for bridge maintenance.

 

5) WAIMALU TO AIEA (WEEKEND WORK)

Shoulder closure on the H-1 Freeway in the eastbound direction between the Pearlridge/Waimalu offramp (Exit 10) and the Aiea Heights Drive overpass for shoulder widening work.

 

  • Friday, March 15, from 9 a.m. continuously through 4 a.m. on Sunday morning, March 17.
  • Monday, March 18, through Thursday, March 21, from 9 a.m. to 7 p.m.
  • Friday, March 22, from 9 a.m. to 11:59 p.m.

 

For more information, please visit the project website at https://h1waimalu.com/

 

6) HONOLULU (24-HOUR WORK)

Shoulder closure on the H-1 Freeway in the eastbound direction in the vicinity of the Airport offramp (Exit 16) on Friday, March 15, through Friday, March 22, over a 24-hour period, for The Rail project.

 

For more information, please visit the project website for The Rail at https://www.honolulutransit.org/.

 

7) HONOLULU (NIGHT WORK)

Lane closure on the H-1 Freeway in the westbound direction between the Palama Street offramp (Exit 20C) and the Houghtailing Street offramp (Exit 20B) on Monday night, March 18, through Friday morning, March 22, from 9 p.m. to 4 a.m., for signage work.

 

8) HONOLULU (NIGHT WORK)
Two lanes closed on the H-1 Freeway in the westbound direction on the Airport offramp (Exit 16), Departures ramp, on Thursday night, March 21, from 11:30 p.m. to 4:30 a.m., for sign work.

 

9) HONOLULU (NIGHT WORK)
Closure of the Airport/Hickam AFB/Pearl Harbor offramp from the westbound H-1 Freeway on Monday night, March 18, through Friday morning, March 22, from 10 p.m. to 4 a.m., for sign work. Motorists will be detoured to the Middle Street offramp (Exit 19A).

 

10) HONOLULU

Alternating lane closure on the H-1 Freeway in both directions in the vicinity of the Keeaumoku Street overpass on Wednesday, Jan. 2, through Friday, Jan. 4, from 8:30 a.m. to 2 p.m., for bridge maintenance work.

 

11) KAHALA (WEEKEND CLOSURE)

Lane closure on the H-1 Freeway in the eastbound direction between the Kilauea Road underpass and Ainakoa Avenue on Saturday, March 16, for the Tour de Cure event. Closures will begin at 5:30 a.m. until the last participant passes through the area. An additional closure is needed on Kalanianaole Highway for this event (see below).

 

More information on the Tour de Cure can be found here.

 

12) KAPOLEI (WEEKEND/NIGHT WORK)

Closure of the H-1 Freeway in the eastbound direction between the Campbell Industrial Park/Barbers Point Harbor offramp (Exit 1A) and the Wakea Street onramp on Thursday night, March 21, through Friday morning, March 22, from 9 p.m. to 4:30 a.m., for the Kapolei Interchange Complex, Phase 2 project. Eastbound motorists will be directed to Kalaeloa Boulevard via the Campbell Industrial Park/Barbers Point Harbor offramp (Exit 1A) and may continue on Kapolei Parkway, Kamokila Boulevard, and Wakea Street to return to the eastbound H-1 Freeway.

 

For more information, visit the Kapolei Interchange Complex Phase 2 project website at https://www.buildkapolei.com/

 

13) KAPOLEI (NIGHT WORK)
Closure of the Campbell Industrial Park offramp/Barbers Point Harbor (Exit 1) from the H-1 Freeway in the westbound direction on Monday night, March 18, through Tuesday morning, March 19, from 10 p.m. to 4 a.m., for underground electrical utility work.

For more information, visit the Kapolei Interchange Complex Phase 2 project website at https://www.buildkapolei.com/

 

14) KAPOLEI (NIGHT WORK)

Up to two left lanes closed on the H-1 Freeway in the westbound direction between the Kunia offramp (Exit 5B) and the Kapolei/Ewa offramp (Exit 3) on Monday night, March 18, through Friday morning, March 22, from 9 p.m. to 4 a.m., for sign upgrades and replacement work.

 

15) PEARL CITY (NIGHT WORK)

Lane closures on the H-1 Freeway in the eastbound direction between the Waiawa Road overpass and the Pearl City/Waimalu offramp (Exit 10) on Tuesday night, March 19, through Friday morning, March 21, from 9 p.m. to 4 a.m., for maintenance work.

 

16) PEARL CITY TO AIEA (WEEKEND/DAY/NIGHT WORK)

Up to three lanes closed on the H-1 Freeway in the eastbound direction between the Waiawa Interchange and the Aiea Heights Drive overpass from 10 a.m. on Friday, March 15, through 6:30 a.m. on Saturday morning, March 16, for shoulder widening work. The shoulder will be closed.

 

  • Right lane will be closed between the Pearlridge/Waimalu offramp (Exit 10) and the Kaonohi Street overpass on Friday from 10 a.m. to 6:30 p.m.
  • Two lanes will be closed between the H-1/H-2 Merge and the Aiea Heights Drive overpass from 6:30 p.m. to 6:30 a.m., and a third lane will be closed from 7:30 p.m. to 6 a.m. Saturday morning.

 

For more information, please visit the project website at https://h1waimalu.com/

 

17) PEARL CITY TO AIEA (WEEKEND/NIGHT WORK)

Up to three lanes closed on the H-1 Freeway in the eastbound direction between the H-1/H-2 merge and the Aiea Heights Drive overpass on Saturday night, March 16, through Monday morning, March 18, for shoulder widening work. The shoulder will be closed.

 

  • Two lanes will be closed on Saturday night from 7 p.m. to 9 a.m., Sunday morning. A third lane will be closed between the hours of 8 p.m. to 7:30 a.m.
  • Two lanes will be closed on Sunday night from 6:30 p.m. to 4 a.m. A third lane will be closed from 7:30 p.m. to 4 a.m., Monday morning.

 

For more information, please visit the project website at https://h1waimalu.com/

 

18) PEARL CITY TO AIEA (NIGHT WORK)

Two right lanes closed on the H-1 Freeway in the eastbound direction between the H-1/H-2 Split and the Aiea Heights Drive overpass on Monday night, March 18, from 6:30 p.m. to 4 a.m., for shoulder widening work.

 

For more information, please visit the project website at https://h1waimalu.com/

 

 

— H-2 FREEWAY —

 

1) MILILANI
Lane closure on the H-2 Freeway in the southbound direction in the vicinity of the Ka Uka Boulevard overpass on Monday, March 18, through Friday, March 22, from 8:30 a.m. to 3 p.m., for guardrail work.

 

2) MILILANI
Alternating lane closure on the H-2 Freeway in both directions in the vicinity of the Mililani Tech Park/Wheeler AAF offramp (Exit 7) on Monday, March 18, through Friday, March 22, from 8:30 a.m. to 2 p.m., for bridge maintenance.

 

3) WAIPAHU
Lane closure on the H-2 Freeway in the southbound direction to the H-1 Freeway in the westbound direction on Monday, March 18, through Friday, March 22, from 8:30 a.m. to 3 p.m., for guardrail improvements.

 

 

— H-201 MOANALUA FREEWAY —

 

1) AIEA

Right lane and shoulder closure on the H-201 Moanalua Freeway in the eastbound direction in the vicinity of the Aiea Access Road overpass on Monday, March 18, through Friday, March 22, from 8:30 a.m. to 3 p.m., for guardrail work.

 

2) HALAWA (NIGHT WORK)

Shoulder closure on the H-201 Moanalua Freeway in the westbound direction between the Stadium/Halawa/Camp Smith offramp (Exit 1E) and the Kahuapaani Street overpass on Monday night, March 18, through Friday morning, March 22, from 9 p.m. to 4 a.m., for sign work.

 

3) MOANALUA

Closure of the Kaua Street onramp to the H-201 Moanalua Freeway in the westbound direction on Tuesday, March 19, from 8:30 a.m. to 12:30 p.m., for electrical maintenance.

 

4) MOANALUA
Right lane and shoulder closure on the H-201 Moanalua Freeway in the eastbound direction between the Ahua Street overpass and the Ola Lane overpass on Tuesday, March 19, through Friday, March 22, from 10 a.m. to 3 p.m., for survey work.

 

H-3 FREEWAY

1) KANEOHE (WEEKEND CLOSURE)

Lane closures on the H-3 Freeway in the Kaneohe-bound direction between the Hospital Rock Tunnel and the Likelike Highway offramp (Exit 9) on Saturday, March 16, from 6 a.m. to 10 a.m., for electrical maintenance work.

 

  • One right lane closed between the Hospital Rock Tunnel and the Likelike Highway offramp (Exit 9)
  • Closure of the Likelike Highway offramp (Exit 9). Motorists traveling on the H-3 Freeway may access Kaneohe via the Kamehameha Highway offramp (Exit 11).

 

 

— FARRINGTON HIGHWAY (ROUTES 93/930) —

 

1) KAPOLEI

Right lane closure on Farrington Highway (Route 93) in the eastbound direction in the vicinity of the Kalaeloa Boulevard overpass on Monday, March 18, from 8:30 a.m. to 12:30 p.m., for electrical work.

 

2) KAPOLEI

Right lane closure on Farrington Highway (Route 93) in the westbound direction at the Kalaeloa Boulevard intersection on Monday, March 18, through Friday, March 22, from 8:30 a.m. to 3 p.m., for electrical work.

 

3) MAKAHA (WEEKEND WORK)

Lane closure on Farrington Highway (Route 93) in the westbound direction between Makua Valley Road and Kaena Point on Saturday, March 16, from 8:30 a.m. to 3 p.m., for utility pole maintenance. Traffic will be contraflowed.

 

4) MAKAHA

Alternating lane closure on Farrington Highway (Route 93) in both directions between Kili Drive and Makua Valley Road on Monday, March 18, through Friday, March 22, from 8:30 a.m. to 3 p.m., for paving work. Traffic will be contraflowed. Pedestrian and bicycle traffic will be limited.

 

5) NANAKULI

Right lane closure on Farrington Highway in the eastbound direction between Piliokahi Avenue and Black Rocks Beach on Monday, March 18, from 8:30 a.m. to 12:30 p.m., for electrical maintenance.

 

6) WAIANAE

Right lane closure on Farrington Highway (Route 93) in the northbound direction between Makaha Valley Road and Kaena Point on Monday, March 18, through Friday, March 22, from 8:30 a.m. to 3 p.m., for pole maintenance work.

 

 

— KALANIANAOLE HIGHWAY (ROUTES 61/72) —

 

1) AINA HAINA (WEEKEND/NIGHT WORK)

Alternating lane closure on Kalanianaole Highway (Route 72) in the eastbound direction between Ainakoa Avenue and West Hind Drive on Sunday night, March 17, through Friday morning, March 22, from 8:30 p.m. to 3:30 a.m., for striping work.

 

2) HAWAII KAI TO WAIMANALO (WEEKEND CLOSURE)

Lane closure at various locations on Kalanianaole Highway in the eastbound direction between Ainakoa Avenue and Keolu Drive on Saturday, March 16, for the Tour de Cure event. Closures will begin at 5:30 a.m. until the last participant passes through the area.

 

More information on the Tour de Cure can be found here.

 

3) KAILUA

Left lane and shoulder closure on Kalanianaole Highway (Route 72) in both directions between Kamehameha Highway and Kailua Road on Monday, March 18, and Tuesday, March 19, from 9:30 a.m. to 12:30 p.m., for maintenance work.

 

4) WAIMANALO (WEEKEND WORK)

Right lane closure on Kalanianaole Highway (Route 72) in the eastbound direction between Keolu Drive and Flamingo Street on Saturday, March 16, from 7 a.m. to 1:30 p.m., for maintenance work.

 

5) WAIMANALO

Intermittent lane closure on Kalanianaole Highway (Route 72) in both directions between Kanapuu Drive and Poalima Street on Monday, March 18, through Friday, March 22, from 8:30 a.m. to 3 p.m., for curb and gutter work.

 

For more information, please visit the Kalanianaole Highway Improvements project website at https://www.gloverltd.com/projects/kalanianaole_highway/.

 

6) WAIMANALO (NIGHT WORK)

Lane closure on Kalanianaole Highway (Route 72) in the Hawaii Kai bound direction between Kumuhau Street and Mekia Street on Monday night, March 18, through Friday morning, March 22, from 7 p.m. to 5 a.m., for roadway reconstruction and utility work.

 

For more information, please visit the Kalanianaole Highway Improvements project website at https://www.gloverltd.com/projects/kalanianaole_highway/.

 

 

— KAMEHAMEHA HIGHWAY (ROUTES 80/83/99) —

 

1) AIEA

Lane closure on Kamehameha Highway (Route 99) in the eastbound direction between the H-201 Moanalua Freeway onramp and Salt Lake Boulevard on Monday, March 18, through Friday, March 22, from 8:30 a.m. to 3 p.m., for slope improvements.

 

2) AIEA
Lane closure on Kamehameha Highway (Route 99) in the westbound direction in the vicinity of Lipoa Place on Monday, March 18, through Friday, March 22, from 8 p.m. to 3 a.m., for maintenance work.

 

3) AIEA

Right lane closure on Kamehameha Highway (Route 99) in the eastbound direction between McGrew Loop and the H-201 Moanalua Freeway onramp on Monday, March 18, through Friday, March 22, from 8:30 a.m. to 3 p.m., for guardrail improvements.

 

4) HALAWA (24-HOUR WORK)

Right lane closure on Kamehameha Highway in the westbound direction in the vicinity of the Salt Lake Boulevard intersection on Monday, March 18, through Friday, March 22, from 8:30 a.m. to 3 p.m., for The Rail project. The sidewalk will be closed on a 24/7 basis.

 

Please visit The Rail’s project website for more details at https://www.honolulutransit.org/.

 

5) HALEIWA TO KAHALUU
Roving lane closure on Kamehameha Highway (Route 83) in both directions between Joseph P. Leong Highway and Kahekili Highway on Monday, March 18, through Friday, March 22, from 8 a.m. to 2 p.m., for maintenance work. Traffic will be contraflowed.

 

6) LAIE

Right lane closure on Kamehameha Highway (Route 83) in the westbound direction in the vicinity of Aakahi Gulch Road on Thursday, March 21, from 8:30 a.m. to 12:30 p.m., for electrical maintenance work. Traffic will alternate.

 

7) PEARL CITY (24-HOUR WORK)

Lane closure on Kamehameha Highway (Route 99) in the eastbound direction between Waihona Street and Acacia Road on Friday, March 15, through Friday, March 22, over a 24-hour period, for The Rail project.

 

Please visit The Rail’s project website for more details at https://www.honolulutransit.org/.

 

8) PEARL CITY

Right lane closure on Kamehameha Highway (Route 99) in the westbound direction between Acacia Road and Waiawa Road on Monday, March 18, through Friday, March 22, from 8:30 a.m. to 3 p.m., for The Rail project.

 

Please visit The Rail’s project website for more details at https://www.honolulutransit.org/.

 

9) WAHIAWA

Roving lane closure on Kamehameha Highway in both directions between the H-2 Freeway and Helemano Road Monday, March 18, through Thursday, March 21, from 6:30 a.m. to 3 p.m., for maintenance work.

 

10) WAIMALU
Up to two lane closures on Kamehameha Highway in the eastbound direction between Hekaha Street and Kaonohi Street on Monday, March 18, through Friday, March 22, from 8:30 a.m. to 3 p.m., for The Rail project.

 

Please visit The Rail’s project website for more details at https://www.honolulutransit.org/.

 

11) WAIMALU
Lane closure on Kamehameha Highway in the westbound direction between Kaonohi Street and Kanuku Street on Monday, Feb. 18, through Friday, Feb. 22, from 7 a.m. to 2:30 p.m., for The Rail project.

 

Please visit The Rail’s project website for more details at https://www.honolulutransit.org/.

 

 

— LIKELIKE HIGHWAY (ROUTE 63) —

 

1) KALIHI

One to two lanes closed on Likelike Highway (Route 63) in the Honolulu-bound direction between Emmeline Place and School Street on Monday, March 18, through Friday, March 22, from 9 a.m. to 3:30 p.m., for grass cutting and maintenance work.

 

2) KALIHI

Lane closure on Likelike Highway (Route 63) in the Kaneohe-bound direction between Gulick Avenue and Emmeline Place on Monday, March 18, through Friday, March 22, from 8:30 a.m. to 3 p.m., for grass cutting and maintenance work.

 

 

— NIMITZ HIGHWAY (ROUTE 92) —

 

1) HONOLULU (WEEKEND/NIGHT WORK)

Right lane closure on Nimitz Highway (Route 92) in the westbound direction in the vicinity of Iwilei Road from 9 p.m. on Friday night, March 15, through 12 p.m. noon on Saturday, March 16, for sewer maintenance.

 

2) HONOLULU (DAY AND NIGHT WORK)

Lane closure on Nimitz Highway in the westbound direction between Alakawa Street and Pacific Street on Monday, March 18, through Friday, March 22, from 8:30 a.m. to 3 p.m. and from 8 p.m. to 4 a.m., for sewer maintenance.

 

3) HONOLULU

Right lane closure on Nimitz Highway (Route 92) in the westbound direction between Waiakamilo Road and Alakawa Street on Wednesday, March 20, from 8:30 a.m. to 12:30 p.m., for electrical maintenance work.

 

4) HONOLULU

Right lane closure on Nimitz Highway in both directions between Sand Island Access Road and Puuloa Road on Monday, March 18, through Friday, March 22, from 7 a.m. to 2:30 p.m., for maintenance work.

 

5) HONOLULU

Alternating roving lane closure on Nimitz Highway (Route 92) in both directions between River Street and Waiakamilo Road on Monday, March 18, through Friday, March 23, from 9:30 a.m. to 2:30 p.m., for utility work.

 

6) KALIHI (NIGHT WORK)

Lane closure on Nimitz Highway (Route 92) in both directions between Alakawa Street and Libby Street on Monday night, March 18, through Friday morning, March 22, from 9 p.m. to 2 a.m., for paving work.

 

 

— PALI HIGHWAY (ROUTE 61) —

 

1) NUUANU TO KANEOHE (WEEKEND AND WEEKLY CLOSURE)
Closure of the Pali Highway (Route 61) in both directions between Waokanaka Street and Kamehameha Highway on Saturday, March 16, through Friday, March 22, over a 24-hour period, for slope stabilization work following the landslide. The Kailua-bound lanes will be temporarily open during the schedule below.

 

From Monday, March 18, through Friday, March 22:

  • Honolulu-bound traffic will be contraflowed in the Kailua-bound lanes between Saint Stephen’s Diocesan Center and Nuuanu Pali Drive from 5 a.m. and 9 a.m.
  • The Kailua-bound direction will be open from 3 p.m. to 7 p.m.

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             

2) MAUNAWILI (WEEKEND WORK)
Roving shoulder closure on the Pali Highway Runaway Truck Ramp in the Kailua-bound diection between the Pali Tunnels and Kamehameha Highway on Saturday, March 16, from 8:30 a.m. to 1 p.m., for maintenance work.

 

3) NUUANU (WEEKEND/NIGHT WORK)

Up to two lanes tentatively closed on the Pali Highway (Route 61) in the Honolulu-bound direction between Waokanaka Street and Nuuanu Avenue on Sunday night, March 17, through Friday morning, March 22, from 7 p.m. to 5 a.m., for the Pali Highway Resurfacing project.

 

For more information, please visit the Pali Highway Resurfacing project website at https://palihighway.org

 

4) NUUANU (WEEKEND/NIGHT WORK)

Up to two lanes tentatively closed on the Pali Highway (Route 61) in the Kailua-bound direction between Nuuanu Avenue and Waokanaka Street on Sunday night, March 17, through Friday morning, March 22, for the Pali Highway Resurfacing project.

 

  • One lane closed from 6:45 p.m. to 9 p.m.
  • Two lanes closed from 9 p.m. to 5 a.m.

 

For more information, please visit the Pali Highway Resurfacing project website at https://palihighway.org

 

5) NUUANU
Right lane closure of the Pali Highway (Route 61) in the Kailua-bound direction between Dowsett Avenue and Coelho Way on Monday, March 18, through Friday, March 24, from 9 a.m. to 5 p.m., for utility work and other construction activities.

 

For more information visit the City’s Dowsett Highlands Sewer Relief project website at https://palisewer.org

 

6) NUUANU

Detour on the Pali Highway (Route 61) in the Kailua-bound direction between Dowsett Avenue and Nuuanu Pali Drive on Monday, March 18, through Friday, March 22, from 9 a.m. to 3 p.m., for saw cutting work.

 

7) NUUANU

Lane closures on the Pali Highway (Route 61) in the Honolulu-bound direction on Monday, March 18, through Friday, March 22, for the Pali Highway Resurfacing project.

 

  • Right lane will be closed from Waokanaka Street to Dowsett Avenue from 9 a.m. to 7 p.m.
  • Lane will be closed at the Funchal Street intersection from 9 a.m. to 3 p.m. Access to Honolulu-bound Pali Highway will be limited to school traffic only. Traffic will be detoured via South Kuakini Street.
  • Right lane will be closed from Pauoa Road to South Kuakini Street from 9 a.m. to 3 p.m.
  • Right lane will be closed from the eastbound H-1 Freeway offramp to Vineyard Boulevard from 9 a.m. to 3 p.m.

 

For more information, please visit the Pali Highway Resurfacing project website at https://palihighway.org

 

8) NUUANU

Lane closures on the Pali Highway (Route 61) in the Kailua-bound direction on Monday, March 18, through Friday, March 22, for the Pali Highway Resurfacing project.

 

  • Right lane will be closed from Vineyard Boulevard to Pauoa Road from 7 a.m. to 3 p.m.
  • Lane will be closed from Pauoa Road to Waokanaka Street from 7 a.m. to 3 p.m.

 

For more information, please visit the Pali Highway Resurfacing project website at https://palihighway.org

 

 

— ALA MOANA BOULEVARD —

 

1) HONOLULU (DAY AND NIGHT WORK)

Right lane closure on Ala Moana Boulevard in the eastbound direction between Keawe Street and Coral Street on Monday, March 18, through Friday, March 22, from 8:30 a.m. to 3 p.m. and from 8 p.m. to 4 a.m., for sewer maintenance work.

 

2) HONOLULU (DAY AND NIGHT WORK)

Lane closure on Ala Moana Boulevard in the eastbound direction in the vicinity of the South Street intersection on Monday, March 18, through Friday, March 22, from 8:30 a.m. to 3 p.m. and from 8 p.m. to 4 a.m., for sewer maintenance work.

 

 

— KALAELOA BOULEVARD —

 

1) KAPOLEI (NIGHT WORK)

Closure of Kalaeloa Boulevard in the northbound direction between the eastbound Kalaeloa Boulevard onramp and Farrington Highway on Monday night, March 18, through Friday morning, March 22, from 8 p.m. to 4:30 p.m., for the Kapolei Interchange Complex Phase 2 project. The eastbound Kalaeloa Boulevard onramp will remain open. Motorists wanting to access the westbound H-1 Freeway will be detoured via Kapolei Parkway, Kamokila Boulevard, and Wakea Street to the Farrington Highway onramp.

 

For more information, visit the Kapolei Interchange Complex Phase 2 project website at https://www.buildkapolei.com/

 

 

— VINEYARD BOULEVARD —

 

1) HONOLULU

Two lane closures on Vineyard Boulevard in both directions between Aala Street and Maunakea Street on Monday, March 18, through Friday, March 22, from 8:30 a.m. to 3 p.m., for traffic signal work.

 

 

— KEAHUMOA PARKWAY —

 

1) KAPOLEI (24-HOUR WORK)

Shoulder lane closure on Keahumoa Parkway in the westbound direction between Maunakapu Street and Kualakai Parkway on Friday, March 15, through Friday, March 22, over a twenty-four hour period, for The Rail project.

 

For more information, please visit the project website for The Rail at https://www.honolulutransit.org/.

 

 

— KUALAKAI PARKWAY —

 

1) KAPOLEI

Lane closures on Kualakai Parkway in both directions between Keahumoa Parkway and Farrington Highway on Monday, March 18, through Friday, March 22, from 8:30 a.m. to 3 p.m., for The Rail project.

 

Please visit The Rail’s project website for more details at https://www.honolulutransit.org/.

 

 

— KAILUA ROAD —

 

1) KAILUA

Alternating lane closure on Kailua Road in both directions between the Pali Highway and Hamakua Drive on Monday, March 18, through Friday, March 22, from 9:30 a.m. to 2 p.m., for maintenance work.

 

 

— FORT WEAVER ROAD (ROUTE 76) —

 

1) EWA (NIGHT WORK)
Right lane closure on Fort Weaver Road (Route 76) in the eastbound direction between Hapalua Street and Popoi Place on Monday, March 18, through Friday, March 22, from 8:30 p.m. to 2:30 a.m., for pole repairs.

 

 

— MOKAPU SADDLE ROAD (ROUTE 630) —

 

1) KAILUA

Alternating lane closure on Mokapu Saddle Road (Route 630) in both directions between Nanamoana Street and Oneawa Street on Monday, March 18, through Friday, March 22, from 8:30 a.m. to 3 p.m., for electrical, guardrail, and striping work.

 

 

—PUULOA ROAD —

 

1) MOANALUA

Lane closure on Puuloa Road in the southbound direction between Salt Lake Boulevard and Mapunapuna Place on Monday, March 18, through Friday, March 22, from 8:30 a.m. to 3 p.m., for electrical maintenance work.

 

 

— SAND ISLAND ACCESS ROAD —

 

1) KALIHI (WEEKEND/NIGHT WORK)

Left lane and median closure on Sand Island Access Road in both directions between Nimitz Highway and Ulupono Street on Friday night, March 15, through Saturday morning, March 16, from 9 p.m. to 4 a.m., for road marking work.

 

 

— KAHUAPAANI STREET —

 

1) HALAWA

Roving right lane closure on Kahuapaani Street in both directions between Salt Lake Boulevard and Halawa Heights Road on Monday, March 18, through Friday, March 22, from 9:30 a.m. to 2 p.m., for sign maintenance work.

 

 

— KALIHI STREET (ROUTE 63) —

 

1) KALIHI (WEEKEND/NIGHT WORK)

Two lanes closed on Kalihi Street (Route 63) in both directions between Dillingham Boulevard and Beckley Street on Sunday night, March 17, through Friday morning, March 22, from 7 p.m. to 4:30 a.m., for striping work.

 

 

— MAIN STREET —

 

1) PEARL HARBOR (24-HOUR WORK)

Right turn pocket closed on Main Street to Nimitz Highway in the eastbound direction on Friday, March 15, through Friday, March 22, over a twenty-four hour period, for The Rail project.

 

For more information, please visit the project website for The Rail at https://www.honolulutransit.org/.

 

 

— MIDDLE STREET —

 

1) KALIHI (WEEKEND/NIGHT WORK)

Alternating lane closure tentatively scheduled on Middle Street in both directions between North King Street and Kamehameha Highway on Friday night, March 15, through Saturday morning, March 16, and on Monday night, March 18, through Friday morning, March 22, from 7 p.m. to 4 a.m., for loop detector and pavement marking installations. Traffic will be contraflowed.

 

Pedestrians are directed to use the east sidewalk as the west shared use walk and bike path is closed on a 24/7 basis.

 

 

 

For Immediate Release: March 15, 2019

19-0134

 

KAUAI LANE CLOSURES

FOR THE WEEK OF MARCH 16 – MARCH 22

 

PLEASE NOTE:

Lane closure schedules may change at any time without further notice.
All projects are weather permitting.

 

— KAUMUALII HIGHWAY (ROUTE 50) —

 

1) HANAPEPE (24/7 CLOSURE)

The Hanapepe River Bridge on Kaumualii Highway (Route 50) between Puolo Road and Iona Road will be closed, and traffic will be shifted to the adjacent temporary bridge over a twenty-four-hour period, seven days a week. Speed limit is reduced to 25 mph.

 

2) LIHUE

Sidewalk closure on Kaumualii Highway (Route 50) in the northbound direction between Rice Street and Hardy Street on Monday, March 18, through Thursday, March 21, from 9 a.m. to 3 p.m., for tree trimming.  Pedestrians will be directed to use the sidewalk adjacent to the southbound lanes.

 

 

— KUHIO HIGHWAY (ROUTES 56/560) —

 

1) KALIHIWAI (NIGHT WORK)

Lane closure on Kuhio Highway (Route 560) in the westbound direction between Kahiliholo Road and Kalihiwai Road on Monday night, March 18, through Friday morning, March 22, from 7 p.m. to 5 a.m., for wall restoration work. Traffic will be contraflowed.

 

2) LIHUE (WEEKEND/NIGHT WORK)

Alternating two-lane closure on Kuhio Highway (Route 56) in both directions between North Leho Drive and Kapule Highway on Sunday night, March 17, through Friday morning, March 22, from 8 p.m. to 5 a.m., for road reconstruction and repaving.

 

3) LIHUE TO HAENA

Alternating lane closures on Kuhio Highway (Route 56/560) in both directions from the beginning of the route in Lihue to the end of the route in Haena on Monday, March 18, through Friday, March 22, from 8:30 a.m. to 3 p.m., for vegetation control and roadside maintenance.

 

4) WAIKOKO TO WAINIHA (EMERGENCY WORK, LOCAL ACCESS BY CONVOY)
Limited access for local traffic on Kuhio Highway (Route 560) between Waikoko and Wainiha on Mondays through Saturdays from 5:50 a.m. to 11 p.m. and Sundays and holidays from 6 a.m. to 11 p.m., due to slope stabilization work. To view the limited access schedule, please click here.

 

 

— MAALO ROAD (ROUTE 583) —

 

1) LIHUE TO WAILUA

Alternating lane closures on Maalo Road (Route 583) in both directions from the beginning of the route at the intersection with Kuhio Highway to the end of the route at Wailua Falls on Monday, March 18, through Friday, March 22, from 8:30 a.m. to 3 p.m., for vegetation control and roadside maintenance.

 

 

— KAPAA BYPASS ROAD (ROUTE 5600) —

 

1) KAPAA

Alternating lane closures on the Temporary Kapaa Bypass Road (Route 5600) in both directions on Monday, March 18, through Friday, March 22, from 8:30 a.m. to 3 p.m., for vegetation control and roadside maintenance.

 

 

— KUAMOO ROAD (ROUTE 580) —

 

1) WAILUA

Alternating lane closures on Kuamoo Road (Route 580) in both directions from the beginning of the route at the intersection with Kuhio Highway to the end of the route on Monday, March 18, through Friday, March 22, from 8:30 a.m. to 3 p.m., for vegetation control and roadside maintenance.

 

 

— AHUKINI ROAD (ROUTE 570) —

 

1) LIHUE

Alternating lane closures on Ahukini Road (Route 570) in both directions from the beginning of the route at the intersection with Kuhio Highway to the end of the route at its intersection with Kapule Highway on Monday, March 18, through Friday, March 22, from 8:30 a.m. to 3 p.m., for vegetation control and roadside maintenance.

 

 

 

For Immediate Release: March 15, 2019

19-0135

 

MAUI LANE CLOSURES

FOR THE WEEK OF MARCH 16 – MARCH 22

 

PLEASE NOTE:

Lane closure schedules may change at any time without further notice.
All projects are weather permitting.

 

— HANA HIGHWAY (ROUTE 36/360) —

 

1) PAIA

Shoulder closure on Hana Highway (Route 36) in the westbound direction between Puna Road and Ulupua Place on Monday, March 18, through Friday, March 22, from 7 a.m. to 3:30 p.m., for bike path work.

 

 

HONOAPIILANI HIGHWAY (ROUTE 30)

 

1) KAPALUA
Honoapiilani Highway (Route 30) between Fleming Beach and Camp Maluhia is limited to local traffic and emergency responders on Monday, March 18, through Friday, March 22, between 6:30 a.m. to 4:30 p.m. for rock scaling. Intermittent closures of 15 min or less may also occur within the closure limits.

2) LAHAINA

Left lane closure on Honoapiilani Highway (Route 30) in the northbound direction between Aholo Road and Lahainaluna Road on Wednesday, March 20, from 8:30 a.m. to 2:30 p.m., for landscape maintenance.

 

 

— KAHEKILI HIGHWAY (ROUTE 30) —

 

1) KEANAE

Lane closures on Kahekili Highway (Route 30) in both directions between mile markers 36 and 42 on Monday, March 18, through Friday, March 22, from 6:30 a.m. to 3:30 p.m., for slope stabilization work.

 

 

KUIHELANI HIGHWAY (ROUTE 380)

 

1) KAHULUI

Lane closure on Kuihelani Highway (Route 380) in both directions in the vicinity of Puunene Avenue on Monday, March 18, through Friday, March 22, from 8 a.m. to 3 p.m., for traffic signal work.

 

 

HOBRON AVENUE

 

1) KAHULUI

Lane closure on Hobron Avenue in the southbound direction between East Kaahumanu Avenue and Hana Highway on Tuesday, March 19, from 8:30 a.m. to 10:30 a.m., for landscape maintenance.

 

 

WEST KAAHUMANU AVENUE

 

1) KAHULUI

Lane closure on West Kaahumanu Avenue in the westbound direction at the Kahului Beach Road intersection on Tuesday, March 19, from 10:30 a.m. to 11:30 a.m., for landscape maintenance.

 

 

PUUNENE AVENUE

 

1) KAHULUI

Lane closure on Puunene Avenue in both directions between Hookele Street and Puukani Street on Monday, March 18, through Friday, March 22, from 8 a.m. to 3 p.m., for traffic signal work.

 

 

KULANIHAKOI STREET

 

1) KIHEI (24-HOUR WORK)

Closure of Kulanihakoi Street in both directions between Piilani Highway and Mahealani Street, over a twenty-four hour period, 7 days a week, for sewer and water line work. Traffic will be directed to Kaonoulu Street and South Kihei Road as an alternate route.

 

 

KAHULUI BEACH ROAD

 

1) KAHULUI

Left lane closure on Kahului Beach Road in the southbound direction between Kaihee Place and West Kaahumanu Avenue on Tuesday, March 19, from 12:30 p.m. to 2:30 p.m., for landscape maintenance.

 

 

 

For Immediate Release: March 15, 2019

19-0136

 

HAWAII ISLAND LANE CLOSURES

FOR THE WEEK OF MARCH 16 – MARCH 22

                                                                                                                  

PLEASE NOTE:

Lane closure schedules may change at any time without further notice.
All projects are weather permitting.

 

— MAMALAHOA HIGHWAY (ROUTE 11/190) —

 

1) KAU

Alternating lane closure on Mamalahoa Highway (Route 11) in both directions between Mile Markers 56 and 57 in the vicinity of Ninole Loop Road on Monday, March 18, through Friday, March 22, from 7:30 a.m. to 5:30 p.m., for paving and construction of temporary bridges.

 

2) KAU

Alternating lane closure on Mamalahoa Highway (Route 11) in both directions between mile markers 48 and 49 in Pahala on Monday, March 18, through Friday, March 22, from 8 a.m. to 2 p.m., for tree trimming work.

3) NORTH KONA

Alternating lane closure on Mamalahoa Highway (Route 190) in both directions in the vicinity of mile markers 29 to 31 on Monday, March 18, through Friday, March 22, from 8 a.m. to 2 p.m., for landscaping and shoulder work.

 

 

— HAWAII BELT ROAD (ROUTE 19) —

 

1) HAMAKUA

Alternating lane closure on Hawaii Belt Road (Route 19) in both directions between mile markers 40 and 43 on Monday, March 18, through Friday, March 22, from 8 a.m. to 6 p.m., for paving work.

 

2) HAMAKUA

Alternating lane closure on Hawaii Belt Road (Route 19) in both directions between mile markers 39 to 41 at Paauilo on Monday, March 18, through Friday, March 22, from 8 a.m. to 2 p.m., for shoulder work.

 

3) NORTH HILO

Alternating lane closure on Hawaii Belt Road (Route 19) in both directions in the vicinity of mile markers 26 and 27 at Laupahoehoe Gulch on Monday, March 18, through Friday, March 22, from 8 a.m. to 2 p.m., for tree trimming work.

 

 

— AKONI PULE HIGHWAY (ROUTE 270) —

 

1) NORTH KOHALA

Alternating lane closure on Akoni Pule Highway (Route 270) in both directions in the vicinity of mile marker 26.5 in Kapaau on Monday, March 18, through Friday, March 22, from 8 a.m. to 2 p.m., for landscaping work.

 

###

 

Patricia Wong

Information Specialist

Hawaii Department of Transportation

869 Punchbowl St. 96813

(808) 587-2160

[email protected]